Main points to engage Enel
As a priority, financial institutions should require Enel to:
- Stop developing new fossil fuel projects (including the extension of existing infrastructure, coal-to-gas conversion, and LNG terminals)
- Commit to a target to reach net-zero by 2035 in EU/OECD countries and by 2040 for the rest of the world
- Commit to close and not to sell or convert gas plants
Enel overview

Revenues
95.6 M€

Installed
gas capacities
17.9 GW

Planned
gas capacities
2 GW

Carbon
intensity
233 gCO2/kWH

Coal
phase-out
2027

Gas
phase-out
2040

Net zero objective
2040
Enel Energy mix
Enel investment strategy

Enel fossil developments plan
Facility location | Type | Capacity | Status | Start year |
---|---|---|---|---|
Andrea Palladio (Italy) | Gas plant | 860 MW | under construction | 2025 |
Termini Imerese (Italy) | Gas plant | 300 MW | pre-construction | Unknown |
Brindisi Sud (Italy) | Gas plant | 840 MW | pre-construction | Unknown |
Larino (Italy) | Gas plant | Unknown | pre-construction | Unknown |
Porto Empedocle (Italy) | LNG terminal | 8 bcm/y | pre-construction | 2026 |